Refer to exhibit.

A customer has a building that needs a switch upgrade. The customer would like at least 20Gbps for the uplink bandwidth out of each closet. The building wiring plan is shown in Exhibit i. The customer will not consider any cabling upgrades at this point. The current proposal is shown in Exhibit 2.
Which correction must the architect make to the proposal to meet the customer requirements?

A customer has a building that needs a switch upgrade. The customer would like at least 20Gbps for the uplink bandwidth out of each closet. The building wiring plan is shown in Exhibit i. The customer will not consider any cabling upgrades at this point. The current proposal is shown in Exhibit 2.
Which correction must the architect make to the proposal to meet the customer requirements?
Correct Answer: C
A hospital needs a Getter way to track its inventory Including wireless medical devices that are moved around the site a lot.
Which solution meets these needs?
Which solution meets these needs?
Correct Answer: B
Compare the scenarios below. For which scenario do AP-575S meet the needs?
Correct Answer: D
Refer to the exhibit.

A museum wants to add full S02.11ax wireless coverage across the building, which is about 210 feet (64 m) by 330 feet (100 m). The museum has 15-foot (4.6 m) ceilings and stone interior walls. The network needs to support up to 600 wireless guest devices The exhibit also shows a preliminary plan tor AP locations, me museum has eight Ethernet drops in the lobby and girt stop, but has otherwise not been wired.
What is one recommendation that the architect should make to ensure a successful deployment?

A museum wants to add full S02.11ax wireless coverage across the building, which is about 210 feet (64 m) by 330 feet (100 m). The museum has 15-foot (4.6 m) ceilings and stone interior walls. The network needs to support up to 600 wireless guest devices The exhibit also shows a preliminary plan tor AP locations, me museum has eight Ethernet drops in the lobby and girt stop, but has otherwise not been wired.
What is one recommendation that the architect should make to ensure a successful deployment?
Correct Answer: A
Refer to the exhibit.

Exhibit: A49.01114316-102
The architect has determined that this building requires two 10GPE links to the data center.
What is the correct transceiver type for the links?

Exhibit: A49.01114316-102
The architect has determined that this building requires two 10GPE links to the data center.
What is the correct transceiver type for the links?
Correct Answer: C
Refer to the exhibit.
A customer has an existing network with ArubaOS switches, Aruba 7205 controller, and 802.11ac APs. The customer needs a wired upgrade for their campus network and wireless upgrade with 802,11ax APs and would like to get all the functions of AP.
The customer has one building with 3 floors with the following wired devices,
* 200 VOIP phones
* 8 printers
* security cameras
The architect plans to propose 75 AP-535s.
The security cameras are a high definition pan-tilt-zoom with heaters for harsh environments that require more than 45 W to function, Which exhibit shows an access switch mat meets the customer needs?
A)

B)

C)

D)

A customer has an existing network with ArubaOS switches, Aruba 7205 controller, and 802.11ac APs. The customer needs a wired upgrade for their campus network and wireless upgrade with 802,11ax APs and would like to get all the functions of AP.
The customer has one building with 3 floors with the following wired devices,
* 200 VOIP phones
* 8 printers
* security cameras
The architect plans to propose 75 AP-535s.
The security cameras are a high definition pan-tilt-zoom with heaters for harsh environments that require more than 45 W to function, Which exhibit shows an access switch mat meets the customer needs?
A)

B)

C)

D)

Correct Answer: A
Refer to the exhibit.

A customer needs a wired upgrade for a building on its main campus. The exhibit shows the switches that the architect has selected for each closet and me existing cabling. The customer is not open to changing the cabling.
The customer requires link redundancy for the uplinks from each closet and for the links from the building to the core. In non link failure situations, the uplinks from each closet must support at least 20Gbps, and the building as a whole must have at least 20 Gbps to the core in non link failure situations Which two options Tor connecting the closets to the network core are valid? (select two.)

A customer needs a wired upgrade for a building on its main campus. The exhibit shows the switches that the architect has selected for each closet and me existing cabling. The customer is not open to changing the cabling.
The customer requires link redundancy for the uplinks from each closet and for the links from the building to the core. In non link failure situations, the uplinks from each closet must support at least 20Gbps, and the building as a whole must have at least 20 Gbps to the core in non link failure situations Which two options Tor connecting the closets to the network core are valid? (select two.)
Correct Answer: B,D