Oracle Absence Management Cloud 2018 Implementation Essentials - 1Z1-1011 Exam Practice Test

A customer created a public holiday on the 25-Dec-2018 (Tuesday) and assigned it to a geography to which an employee belongs to. However, the employees do not have a work schedule assigned. The employee records an absence from 24-Dec-2018 (Monday) to 26-Dec-2018 (Wednesday) using an absence type that measures duration in Days.
What will be the duration of the absence recorded?
Correct Answer: C
When assigning work schedules via Manage Work Schedule Assignment Administration task, which level has the highest priority and which level the lowest?
Correct Answer: D
Identify three adjustment types that can be avoided via the administrative task Update Balance Details.
Correct Answer: B,C,D
Which is the parameter for limiting processing to a specific set of workers in the Evaluate Absence process?
Correct Answer: D
What is the difference between an absence type and an absence plan?
Correct Answer: B
Which three types of Exceptions can be linked to a work schedule?
Correct Answer: A,B,E
A worker is scheduled to work from Monday to Friday. As an HR administrator, you receive a call from the worker on Friday evening 16-Jun-2017, that they are on vacation from 17-Jun-2017 (Saturday) and will be back at work on 26-Jun-2017 (Monday). The absence type for vacation has no duration formula or plans attached and the duration is measured in Days. There is a calendar exception on 23-Jun-2017 (Friday).
What should be the start date, end date, and the duration of this absence record if the "Schedule nonworking days" is set to "Not enabled"?
Correct Answer: D
What are the tasks that you need to perform to create an absence element to integrate with Payroll?
Correct Answer: C
0
0
0
0