Your customer runs production 24 x 7 x 365 and wants to track Overall Equipment Effectiveness (OEE) online.
Which key setup can they use to achieve this?
Which key setup can they use to achieve this?
Correct Answer: D
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
You have been asked to set up cost estimates for 10 different purchased items. Which two tasks can you perform to achieve this?
Correct Answer: C,E
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
Your customer needs to add additional information to their work order traveler. Which statement is NOT true about the Extensible Work Order Traveler?
Correct Answer: E
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
A Production Operator needs to review the materials issued, resources charged, and operations performed for a job that was executed in the previous shift.
Which task should the operator select to review all the transactions in a single place for both work order and orderless execution?
Which task should the operator select to review all the transactions in a single place for both work order and orderless execution?
Correct Answer: D
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
Your customer is a light assembly manufacturing company that doesn't require shop floor control. A Manufacturing Engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.
Which three steps must they perform and verify in the Work Definition area?
Which three steps must they perform and verify in the Work Definition area?
Correct Answer: A,C,E
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
In a manufacturing plant, two purchase components, PI and P2, and a resource, Rl, are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates for the assembly have been defined as Required.
A Cost Accountant is estimating cost of the assembly, and analyzing rolled-up costs before finally publishing estimates as frozen standards to Cost Accounting by using a Cost Planning Scenario. While reviewing rolled-up costs, the extended costs of purchase components are not included in a rolled-up scenario.
What is the reason for this?
A Cost Accountant is estimating cost of the assembly, and analyzing rolled-up costs before finally publishing estimates as frozen standards to Cost Accounting by using a Cost Planning Scenario. While reviewing rolled-up costs, the extended costs of purchase components are not included in a rolled-up scenario.
What is the reason for this?
Correct Answer: D