Your client currently has two manufacturing plants, plants, four Inventory locations, and one distribution center. When doing the future state analysis, the Operations Directory at the client site said that they have expansion plans after the go-live of the current Oracle in Implementation. They plan to add 10 more distribution centers and these can be transfer of goods between any two distribution centers. Each distribution center would need to optimize its inventory level and forecasts will be handled in Demand Planning for better customer satisfaction.
The client IT Manager proposes to use one main inventory Organization to represent all the facilities and use sub inventories to represent the various inventory locations in the manufacturing plant and the distribution center. The future distribution centers can be modeled as subinventories because Oracle allows you to define a large number of subinventories. From the system point of view, It will be easier to maintain and inventory transfers between sub inventor using Move Orders are possible.
Select three correct statements about the above scenario.
The client IT Manager proposes to use one main inventory Organization to represent all the facilities and use sub inventories to represent the various inventory locations in the manufacturing plant and the distribution center. The future distribution centers can be modeled as subinventories because Oracle allows you to define a large number of subinventories. From the system point of view, It will be easier to maintain and inventory transfers between sub inventor using Move Orders are possible.
Select three correct statements about the above scenario.
Correct Answer: A,B,D
Identify two correct product aggregation levels available In ASCP.
Correct Answer: F,G
Which two statements are correct about Use-Up Date in Engineering Change Order (ECO)?
Correct Answer: D
The following is the business scenario at your client site:
1) Your client manufactures goods that can be produced In alternate ways that requires flexible definition of Routings.
2) They have multiple manufacturing Organizations namely Ml, M2, and M3.
3) The future operation details of Jobs need to be stored only In Ml and M3.
4) A complete recommended path for a Job should exist and should be updatable.
Which one will be part of your solution?
1) Your client manufactures goods that can be produced In alternate ways that requires flexible definition of Routings.
2) They have multiple manufacturing Organizations namely Ml, M2, and M3.
3) The future operation details of Jobs need to be stored only In Ml and M3.
4) A complete recommended path for a Job should exist and should be updatable.
Which one will be part of your solution?
Correct Answer: C
Identify three correct statements about phantom Items?
Correct Answer: A,C,F
You have Late Replenishment for Sales Orders exceptions In a constrained plan. Which two methods could be used to find the cause of the lateness?
Correct Answer: D
The following are attributes for an ASCP data store:
1. This Is one of the data stores used In ASCP between launches of the planning engine to collect data.
2. To perform action, this specific type requires data to be moved from the transaction data store to this data store.
3. This specific type requires you, as a planner, to be aware of the timing Issues involved in data collection.
4. This specific type could be said to refer to systems that instruct what the transaction systems need to do to meet demand.
Identify this ASCP data store.
1. This Is one of the data stores used In ASCP between launches of the planning engine to collect data.
2. To perform action, this specific type requires data to be moved from the transaction data store to this data store.
3. This specific type requires you, as a planner, to be aware of the timing Issues involved in data collection.
4. This specific type could be said to refer to systems that instruct what the transaction systems need to do to meet demand.
Identify this ASCP data store.
Correct Answer: A
Identify five Material Constraints.
Correct Answer: A,B,C,E
Identify the three correct statements about the setups required to enable pegging within an ASCP plan.
Correct Answer: A,C,E