A LEED AP is calculating water use for a new construction project. Considering WEp2: Minimum Water Efficiency, what is the total water use from the following fixtures and appliances?
* Toilet: 600 gal. (2,271.2 L)
* Urinal: 300 gal. (1,135.6 L)
* Kitchen faucet: 100 gal. (378.5 L)
* Commercial dishwasher: 200 gal. (757.1 L)
* Lavatory faucets: 200 gal. (757.1 L)
Correct Answer: C
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following information is required to be present in the Owner's Project Requirements (OPR)?
Correct Answer: D
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
Which of the following cannot be classified as graywater?
Correct Answer: C
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
Which of the following is required when documenting a LEED Pilot credit?
Correct Answer: D
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
During construction, a value engineering exercise was conducted. This exercise has resulted in cost savings for the project. However, it is expected that the changes will affect some of the energy efficiency measures. The team has already submitted Energy and Atmosphere Credit, Optimize Energy Performance for review, and Green Business Certification Inc. (GBCI) returned an anticipated reply. What should the project team do in this situation?
Correct Answer: C
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
A project team is attempting Location and Transportation Credit, High Priority Site, and selects Option 1: Historic District. To demonstrate that the project is in an infill site, the project team must confirm that:
Correct Answer: C
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
Which of the following characteristics are a requirement of a compliant water meter?
Correct Answer: A
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
Which of the following project types is required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations?
Correct Answer: B
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
Which of the following strategies reflects a synergy between EQc2: Occupant Experience, Option 5. Lighting Environment and Energy and Atmosphere credits?
Correct Answer: B
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
An owner has insisted on using a non-native or non-adapted plant species on both the vegetated roof and ground level. What Sustainable Sites credit will this decision impact the most?
Correct Answer: C
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
Which of the following LEED credit data should be used for a comprehensive 25-year carbon-emissions projection for a new building project?
Correct Answer: B
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
A project team is using the whole building simulation model to quantify the percentage of energy savings for the project. Which of the following should remain the same for both the baseline building and the proposed building?
Correct Answer: D
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
During preliminary energy analysis, what energy reduction strategies can best help in reducing the energy load in the new building construction project?
Correct Answer: D
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
To assess the feasibility of earning Location and Transportation Credit, Reduced Parking Footprint, the project team should be familiar with what local government regulation?
Correct Answer: C
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
A new office-building project has implemented several water-saving strategies, achieving a 25% reduction in potable-water consumption through low-flow fixtures, efficient irrigation systems, and related measures. The project has also integrated a rainwater-harvesting system that contributes an additional 10% reduction in potable-water use.
The project team seeks to maximize its points under WEc2: Enhanced Water Efficiency by adopting the Whole-Project Water Use approach. How many total points can the project potentially earn for potable-water reduction, considering its use of alternative water sources?
Correct Answer: A
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).