USGBC LEED AP Interior Design + Construction (LEED AP ID+C) V4 - LEED-AP-ID-C Exam Practice Test
After the construction and installation of all finishes and furnishing of a new 36,000 ft2 (3 344.5m2) office space, what is the minimum total volume of outdoor air that is required during a non-phased flush-out procedure to achieve Indoor Environmental Quality Credit, Indoor Air Quality Assessment?
Correct Answer: A
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
Which sentence is true about Renewable Energy Certificates (RECs)?
Correct Answer: C
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
The project architect suggests reducing the area planned for surface parking and replacing it with additional green space. What benefit would this strategy provide to the owner?
Correct Answer: D
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
A photovoltaic (PV) system was installed after commissioning (Cx) was completed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?
Correct Answer: D
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
To satisfy the Increased Ventilation strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, the breathing zone rates of outdoor air ventilation to all occupied spaces must be increased above the minimum rates required in ASHRAE 62.1-2010 by at least what percentage?
Correct Answer: D
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
For Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification, the final Cx report must include the
Correct Answer: C
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
Discussing the project goals to help identify the credits and options that the team should attempt is an example of
Correct Answer: A
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
Which of the following must be considered in order to meet Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management if the tenant requires 24-hour cooling in a server room?
Correct Answer: D
Which of the following information is needed to document the non-structural elements that will be reused from the existing space in a LEED AP Interior Design and Construction project?
Correct Answer: A
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
A tenant is targeting LEED Platinum certification and has hired a LEED AP Interior Design and Construction consultant to help identify and use opportunities to achieve synergies across disciplines and building systems.
Which of the following analyses are required to be completed in the Integrated Process Worksheet to achieve an additional point?
Which of the following analyses are required to be completed in the Integrated Process Worksheet to achieve an additional point?
Correct Answer: A
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).