NCARB ARE 5.0 Project Management (PjM) - Project-Management Exam Practice Test
What is the primary purpose of a construction schedule?
Correct Answer: C
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
While conducting a site visit for a residential tower delivered through the design-build method, an architect observes several construction workers without hard hats and other unsafe working conditions.
How should the architect proceed?
How should the architect proceed?
Correct Answer: C
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
An architectural firm is developing construction documents (CDs) for a multi-story manufacturing facility.
The project requirements include high-volume ventilation and filtration air distribution systems and heavy floor load design to accommodate the manufacturing equipment and processes. The project manager (PM) is planning for coordination and constructability review of the project documents at 80% CDs.
What actions should the PM take to ensure an effective quality control review? Check the three that apply.
The project requirements include high-volume ventilation and filtration air distribution systems and heavy floor load design to accommodate the manufacturing equipment and processes. The project manager (PM) is planning for coordination and constructability review of the project documents at 80% CDs.
What actions should the PM take to ensure an effective quality control review? Check the three that apply.
Correct Answer: B,C,D
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
A contractor has hired a subcontractor to construct a parking lot for 60 cars. The parking lot will be 60 feet x
270 feet. The subcontractor has quoted a price of $13.25 per square yard to the contractor.
If the contractor adds a mark-up of 15%, what is the cost of each parking space?
270 feet. The subcontractor has quoted a price of $13.25 per square yard to the contractor.
If the contractor adds a mark-up of 15%, what is the cost of each parking space?
Correct Answer: C
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
What is the best method for an architect to reduce liability related to unknown site conditions?
Correct Answer: B
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
What is the architect's role regarding shop drawings?
Correct Answer: D
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
What is the primary purpose of a punch list?
Correct Answer: D
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).
During the initial construction documents phase meeting, the owner states a strong desire to decrease the time required for the construction documents phase. The owner plans to submit the documents to the building department early for the building permit. Although the project is currently on schedule, the architect plans to comply with the owner's request.
Which action should the architect take?
Which action should the architect take?
Correct Answer: C
Explanation: Only visible for TrainingDump members. You can sign-up / login (it's free).