TPCB Professional Traffic Operations Engineer Practice - PTOE Exam Practice Test

What does the Peak Hour Factor (PHF) measure?
Correct Answer: A
A professional engineer discovers a subcontractor using substandard materials for a traffic control device installation. What is the ethical course of action per the NCEES Model Rules?
Correct Answer: D
Which entity passes engineering registration laws establishing the minimum criteria required to protect the public?
Correct Answer: D
According to the HCM, what is the capacity adjustment factor for a freeway segment with a driver population consisting of 20% unfamiliar drivers?
Correct Answer: B
According to the AASHTO Roadside Design Guide, design options for treating roadside obstacles, in order of preference, are:
Correct Answer: C
Which of the following is NOT true about Road Safety Audits?
Correct Answer: A
What is speed defined as in traffic engineering?
Correct Answer: D
Which of the following is NOT part of a motorist information system:
Correct Answer: C
Under base conditions what is generally considered to be freeway capacity?
Correct Answer: A
Which is NOT a site specific transportation demand management program element:
Correct Answer: B
Intersection departure sight triangles should be provided for drivers entering the intersection from a STOP- controlled minor road. What is the intersection departure sight distance for this condition if the AASHTO recommended time gap is 7.5 seconds and the design speed of the major road is 60 mph?
Correct Answer: C
On a freeway with a flow rate of 3,000 vehicles per hour and a space mean speed of 60 mph, what is the density of traffic flow?
Correct Answer: C
According to the MUTCD, what is the minimum vertical clearance for a traffic signal pole installed over a roadway?
Correct Answer: B
What is the minimum length of a crest vertical curve on a road with a design speed of 60 mph, an algebraic difference in grades of 4%, and a K-value of 151, per AASHTO standards?
Correct Answer: C