(Aug-2022) Get professional help from our NACE-CIP1-001 Dumps PDF [Q58-Q76]

Share

(Aug-2022) Get professional help from our NACE-CIP1-001 Dumps PDF

Give You Free Regular Updates on NACE-CIP1-001 Exam Questions


The certification path of the NACE CIP1-001 exam is explained here.

You can get a certification if you pass the NACE CIP1-001 exam. You should not take a risk while choosing the NACE CIP1-001 certification. We are offering you the best NACE CIP1-001 exam dumps. The NACE CIP1-001 exam is designed by experienced professionals. They have written different kinds of questions on the topic related to the NACE CIP1-001 exam.

 

NEW QUESTION 58
Checking is

  • A. a fine crack in the surface of a coating that rarely reaches the substrate
  • B. surface breaks in the film that often result from grease or oil contamination and revel the substrate.
  • C. an exposed area of the substrate or previous coat material, caused by poor application technique.
  • D. a very small hole in a coating caused when air or solvent is trapped in porous film and then escapes.

Answer: A

 

NEW QUESTION 59
You are asked to be the only coating inspector on a small bridge recoating job where existing coating contains lead. The owners' representative has supplied you with the local code governing the removal and disposal of lead based coatings, however upon reading the document you having great deal of difficulty understanding the technical language.
As a NACE CIP Level 1 Inspector your preferred course of action is to:

  • A. Carefully review the document and do the best you can
  • B. Advise the owners' representative of your lack of knowledge in this area
  • C. Minimize your lack of understanding and go ahead with the inspection task to the best of your ability
  • D. Hire a third patty to assist you in understanding the document

Answer: A

 

NEW QUESTION 60
When holiday testing is required the Inspector is always required to enforce NACE SP 0188:

  • A. True
  • B. False

Answer: A

 

NEW QUESTION 61
Surface profile describes:

  • A. The level of surface cleanliness required after abrasive blasting
  • B. The initial condition of the surface prior to abrasive blasting
  • C. The general condition of the surface required after abrasive blasting
  • D. The level of surface roughness required after abrasive blasting

Answer: D

 

NEW QUESTION 62
When performing tests for oil and grease using an ultra-violet light, the NACE Inspector should be aware that:

  • A. Presence of weld spatter may produce a false positive
  • B. Synthetic oil or grease may not be identified
  • C. Chloride salt may produce a false positive
  • D. Ultra-Violet light may contaminant the surface

Answer: B

 

NEW QUESTION 63
Check abrasive blast pressure with a

  • A. needle pressure gauge
  • B. nozzle aperature gauge
  • C. surface comparator
  • D. replica tape

Answer: A

 

NEW QUESTION 64
In a non-convertible coating the role of the primary solvent is to:

  • A. To control the evaporation rate
  • B. To make the coating flow out better
  • C. To dissolve the resin
  • D. To promote faster cure

Answer: A

 

NEW QUESTION 65
Non Conformance Reports are completed by the Inspector:

  • A. When the Inspector and Contractor deem it to be a significant non-conforming item
  • B. When the Inspector deems it to be a significant non-conforming item
  • C. In accordance with the specification's definition of a non-conformance
  • D. In every instance that an item does not meet the specification requirements

Answer: A

 

NEW QUESTION 66
Osmotic blistering is most likely to occur as a result of

  • A. applying tine coating too thin.
  • B. inadequate anchor pattern/surface profile.
  • C. overcoating a surface contaminated with chemical salts.
  • D. airless spray application

Answer: D

 

NEW QUESTION 67
In the event of a conflict between the project specification and the coating manufactures' product data sheet, the Inspector's first course of action should be too:

  • A. Use the job specification as a guide
  • B. Use the product data sheet as a guide
  • C. Call the coating manufacturer for clarification
  • D. Call the person who wrote the specification for clarification

Answer: A

 

NEW QUESTION 68
If inspectors identify issues of non-conformance during an inspection, they should

  • A. instruct the contractor's personnel in how to correct the issue so the project is not delayed
  • B. perform additional tests secretly to ensure there are no other potential issues at the site
  • C. wait until the final report is being prepared to identify the issues in writing so they are fully documented
  • D. inform both the Contractor and the inspector's supervisor so they can take appropriate corrective actions

Answer: D

 

NEW QUESTION 69
When working as a NACE Inspector in a situation where there is a difference of opinion, the Inspector needs to:

  • A. Achieve consensus through negotiation
  • B. Never change his/her mind
  • C. Call the supervisor
  • D. Go with the majority opinion

Answer: C

 

NEW QUESTION 70
Polymerization is the process of:

  • A. All organic coatings
  • B. Monomers telegraphing
  • C. Monomers joining together
  • D. All thermoplastic coatings

Answer: C

 

NEW QUESTION 71
Owners hire NACE Inspectors' with the expectation that:

  • A. a) and c)
  • B. The Inspector will make a meaningful technical contribution to the job
  • C. The inspection cost will be offset by an improvement in service life
  • D. The Inspector will improve job flow and schedule

Answer: A

 

NEW QUESTION 72
The Inspector's Log Book is generally:

  • A. Retained by the inspector upon project completion
  • B. Submitted to the client upon project completion
  • C. Shredded by the inspector upon project completion
  • D. Shared with all parties upon project completion

Answer: A

 

NEW QUESTION 73
Conventional spray is a good choice when:

  • A. High viscosity coatings are being applied
  • B. High transfer efficiency is required
  • C. High production rates are required
  • D. High quality finishes are required

Answer: D

 

NEW QUESTION 74
You ate the NACE Inspector on a job where NACE No. 2/SSPC - SP 10 has been specified. You are finding the Contractor is leaving mill scale on the on surface and as a result you have been rejecting the blast. The Contractor is very upset and has told you that the standard permits up to 5% of the mill scale to remain and still be in be in compliance with the standard.
Your FIRST preferred course of action is to:

  • A. Shut the job down
  • B. Review the relevant standard with the Contractor
  • C. Permit coating to take place so as not to lose the blast
  • D. Call your supervisor

Answer: B

 

NEW QUESTION 75
ISO SA 3 is directly equivalent to:

  • A. NACE No. 2/SSPC SP 10
  • B. NACE No. 3/SSPC SP 6
  • C. NACE No. 1/SSPC SP 5
  • D. None of the above

Answer: D

 

NEW QUESTION 76
......

Achieve the NACE-CIP1-001 Exam Best Results with Help from NACE Certified Experts: https://www.trainingdump.com/NACE/NACE-CIP1-001-practice-exam-dumps.html

Provide NACE-CIP1-001 Practice Test Engine for Preparation: https://drive.google.com/open?id=16bbINckbhTOILbF4hL_i-ERIKhwjEfAN

0
0
0
0