
Best Value Available! 2025 Realistic Verified Free C-TS422-2023 Exam Questions
Pass Your Exam Easily! C-TS422-2023 Real Question Answers Updated
SAP C-TS422-2023 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
| Topic 9 |
|
NEW QUESTION # 26
What is the purpose of a reporting point confirmation in repetitive manufacturing?
Note: There are 2 Correct answers to this question?
- A. To provide timely updates of inventory management for the staged components
- B. To stage different components for a production line simultaneously
- C. To determine the work in progress along the production line
- D. To reduce the total production lead time for a long production line
Answer: A,C
Explanation:
A reporting point confirmation is a function that allows you to backflush the material components and activities that have been consumed and performed at a specific operation in a repetitive manufacturing process. It also reduces the dependent requirements for the planned orders. You can use reporting point confirmation for the following purposes:
To determine the work in progress (WIP) along the production line, by posting the quantity that is on the production line at each reporting point. This helps you to calculate the volume and value of unfinished products.
To provide timely updates of inventory management for the staged components, by recording the withdrawal of components at a time that is close to the time of the operation in which they are used. This helps you to avoid discrepancies between the actual and planned consumption of materials. Reference: Reporting Point Confirmation, Repetitive Manufacturing Confirmation
NEW QUESTION # 27
How can you support a GMP (Good Manufacturing Practice) compliant production process? Note: There are
3 correct answers to this question.
- A. Approved resources
- B. GMP-compliant flag
- C. Batch record
- D. Digital signature
- E. Recipe approval
Answer: C,D,E
Explanation:
In SAP S/4HANA Cloud Private Edition, supporting aGood Manufacturing Practice (GMP)compliant production process (common in industries like pharmaceuticals) involves features to ensure traceability, quality, and regulatory adherence:
* Digital signature(A): SAP supports digital signatures (configured in Customizing, Cross-Application Components > General Application Functions > Digital Signature) for critical process steps (e.g., order release in CO02 or confirmation in CO11N). This ensures authorized personnel approve actions, meeting GMP requirements for accountability andaudit trails.
* Recipe approval(C): In process manufacturing, recipes (process orders use Production Process Models or Master Recipes, transaction C201) require approval (status change, e.g., from "Created" to
"Released" via ECM or C202). This ensures only validated production instructions are used, a key GMP compliance step.
* Batch record(E): The electronic batch record (EBR, transaction COEBR or integrated in process order management) documents all production details (e.g., materials, quantities, quality checks). It's mandatory for GMP to provide a complete, auditable history of each batch (configured via process order settings).
Approved resources(B) isn't a standard SAP term-resources (work centers, CR02) can be quality-checked, but approval is process-driven, not a distinct feature.GMP-compliant flag(D) doesn't exist as a specific field- GMP compliance is achieved through process controls, not a single indicator. This is per SAP's GMP support documentation.
NEW QUESTION # 28
You want to use capacity availability checks for production orders. Which settings have to be made for this?
Note: There are 2 correct answers to this question.
- A. The Relevant for Finite Scheduling indicator must be set.
- B. The scope of check must be defined in Customizing.
- C. A checking rule must be assigned to the work centers.
- D. An overall profile must be assigned in the checking control.
Answer: A,D
Explanation:
To enable capacity availability checks for production orders in SAP S/4HANA, specific settings ensure the system evaluates work center capacity:
* The Relevant for Finite Scheduling indicator must be set(A): In the work center (transaction CR02, Capacity tab, field: Relevant to Finite Scheduling), this indicator must be activated. It ensures the system considers capacity limits during scheduling and availability checks, treating the work center as finite rather than infinite.
* An overall profile must be assigned in the checking control(D): In Customizing (Production > Shop Floor Control > Operations > Capacity Planning > Define Checking Control), the checking control links the order type and plant to an overall profile (e.g., SAPSFCG013). This profile (defined in Capacity Planning Customizing) specifies how capacity is checked(e.g., scope, tolerances) during order release or creation.
The scope of check(B) is part of the overall profile, not a separate setting in this context.A checking rule in work centers(C) applies to material availability or ATP checks, not capacity checks, which rely on the capacity profile and finite scheduling settings. This is detailed in SAP's capacity planning documentation.
NEW QUESTION # 29
During production order creation, several valid production versions are found. How does the system choose the production version?
- A. Alphanumeric or quota arrangement
- B. Lot size or material cost
- C. Validity period or sales order
- D. Planned order or material number
Answer: C
Explanation:
The system chooses the production version based on the validity period and the sales order. The validity period determines whether the production version is valid for the planned start date of the production order. The sales order determines whether the production version is assigned to a specific sales order item or not. If there are multiple production versions that meet these criteria, the system chooses the one with the lowest alphanumeric value. Reference: [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 113; [SAP Help Portal: Production Version]
NEW QUESTION # 30
How can you characterize dependent requirements in material requirements planning?
Note: There are 2 correct answers to this question.
- A. They are created when an independent requirement is created for the finished product.
- B. They are created on assembly level during the planning run.
- C. They are only created for multilevel bill of material (BOM) structures
- D. They are created with exact times in Advanced Planning.
Answer: A,B
Explanation:
Dependent requirements are the requirements for components that are derived from the requirements for the finished product or assembly. They are created when an independent requirement is created for the finished product or assembly, such as a planned independent requirement, a sales order, or a stock transport order. They are also created on assembly level during the planning run, when the system explodes the bill of material (BOM) of the finished product or assembly and calculates the requirements for the components based on the BOM structure and quantity. Dependent requirements can be created for multilevel or single-level BOM structures, depending on the planning strategy and the BOM explosion level. Reference: Dependent Requirements | SAP Help Portal, Material Requirements Planning (PP-MRP) | SAP Help Portal.
NEW QUESTION # 31
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
- A. Increase the capacity supply in a time-phased interval.
- B. Reduce the planning time interval.
- C. Determine a time period with available capacity on the planning board.
- D. Execute an infinite production planning run for the critical resources.
- E. Form optimum sequences to reduce setup times.
Answer: A,C,E
Explanation:
In SAP S/4HANA PP/DS, achieving a feasible production plan under capacity constraints involves:
* Determine a time period with available capacity on the planning board(C): Using the DS Planning Board (/SAPAPO/CDPS0), planners can visually identify periods with free capacity on resources and manually or automatically schedule orders into those slots, ensuring feasibility.
* Increase the capacity supply in a time-phased interval(D): In the work center (CR02, Capacity tab) or PP/DS resource (/SAPAPO/RES01), you can define additional capacity (e.g., shifts, overtime) for specific time intervals via capacity variants, allowing more orders to fit within constraints.
* Form optimum sequences to reduce setup times(E): Using heuristics (e.g., SAP_PP_020) or the PP/DS Optimizer, you can sequence operations on resources to minimize setup times (defined in routing, CA02), maximizing throughput and resolving capacity bottlenecks.
Execute an infinite planning run(A) ignores capacity constraints, creating an unfeasible plan requiring later adjustment-not a solution.Reduce the planning time interval(B) (e.g., horizon in /SAPAPO/CDPSC11) limits scope but doesn't address capacity directly. This is per SAP's PP/DS capacity planning strategies.
NEW QUESTION # 32
You want to create a production order.
What methods can you use?
Note: There are 2 correct answers to this question.
- A. Create in Kanban process
- B. Create without material
- C. Create by order release
- D. Convert a purchase requisition
Answer: A,B
NEW QUESTION # 33
How can a material availability check be triggered automatically for a production order? Note: There are
2 correct answers to this question.
- A. By mass processing
- B. By order release
- C. By order confirmation
- D. By capacity planning
Answer: A,B
NEW QUESTION # 34
Which of the following automation options can you use for production orders?
Note: There are 2 correct answers to this question.
- A. You can use mass processing to read PP master data for production orders.
- B. You can use trigger points to automatically create rework orders via confirmations.
- C. You can use mass processing to set production orders to technically complete.
- D. You can use the production scheduling profile to automatically set orders to technically complete.
Answer: B,C
NEW QUESTION # 35
What could be the reason for multiple commitments where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question.
- A. The Finite Scheduling indicator is NOT set in the strategy profile.
- B. Alternative work centers are fully occupied.
- C. The Change Planning Direction indicator is set in the strategy profile.
- D. The work center has several individual capacities.
Answer: A,D
Explanation:
In SAP S/4HANA, dispatching operations (e.g., in CM21 or PP/DS Planning Board) assigns them to work centers. Multiple commitments on the same date indicate overlapping schedules, caused by:
* The Finite Scheduling indicator is NOT set in the strategy profile(A): In PP/DS (strategy profile,
/SAPAPO/CDPSC11) or capacity planning (OPU5), if finite scheduling isn't active (e.g., work center CR02, Capacity tab, "Relevant to Finite Scheduling" unchecked), the system schedules operations infinitely, ignoring capacity limits and allowing overlaps on the same date.
* The work center has several individual capacities(B): If the work center (CR02, Capacity tab) has multiple individual capacities (e.g., 3 machines, field: No. of Individual Capacities), operations can be scheduled in parallel on the same date, each assigned to a separate capacity, resulting in multiple commitments.
Alternative work centers fully occupied(C) might force scheduling onto one center but doesn't inherently cause overlaps-it's a capacity issue, not a scheduling logic flaw.Change Planning Direction indicator(D) (e.
g., Forward/Backward in strategy profile) affects sequence, not overlapping commitments. This is per SAP's scheduling behavior.
NEW QUESTION # 36
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
- A. To simplify the structure of bills of material
- B. To make the assignment of components easier
- C. To reduce the number of changes required in bills of material
- D. To reduce the number of material masters
- E. To increase the number of planning levels
Answer: A,B,D
Explanation:
Phantom assemblies are assemblies that have their own product structure, but whose assembly does not actually physically exist. The components of the phantom assembly are incorporated directly in the superordinate product. The product structure of the superordinate product contains a reference to the phantom assembly. You can use phantom assemblies for the following purposes:
To simplify the structure of bills of material: Phantom assemblies allow you to group components that belong together logically or functionally, without creating an additional level in the product structure. This can make the product structure easier to maintain and understand.
To reduce the number of material masters: Phantom assemblies do not require a material master record in SAP S/4HANA, as they are not physically produced or stored. This can save storage space and reduce the effort of creating and updating material masters.
To reduce the number of changes required in bills of material: Phantom assemblies can be used to represent common subassemblies that are used in multiple products. This way, you only need to maintain the product structure of the phantom assembly once, and any changes will be reflected in all the products that reference it.
Phantom assemblies do not increase the number of planning levels, as they are not considered as separate planning objects. They also do not make the assignment of components easier, as the components are assigned to the superordinate product, not to the phantom assembly. Reference: Phantom Assembly | SAP Help Portal, Phantom Assembly | SAP Help Portal, Planning Phantom Assemblies | SAP Help Portal.
NEW QUESTION # 37
You can you use capacity availability checks for production orders, which settings have to be made for this?
Note: There are 2 Correct answers to this question?
- A. A checking rule must be assigned to the work centers
- B. The scope of check must be defined in customizing.
- C. An overall profile must be assigned in the checking control
- D. The relevant for finite scheduling indicator must be set.
Answer: C,D
Explanation:
To use capacity availability checks for production orders, you need to make the following settings:
The relevant for finite scheduling indicator must be set for the work centers or resources that you want to check. This indicator determines whether the system considers the capacity of the work center or resource during the capacity availability check and finite scheduling. You can set this indicator in the work center or resource master data, or in the routing or production version of the order12.
An overall profile must be assigned in the checking control for the order type and plant. The overall profile defines the parameters for the capacity availability check, such as the period profile, the selection profile, the checking horizon, and the reaction. You can assign the overall profile in Customizing for Capacity Planning under Availability Check -> Checking Control34.
Reference:
1: SAP Help Portal: Work Center/Resource
2: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 5: Master Data
3: SAP Help Portal: Checking Control
4: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 9: Capacity Planning
NEW QUESTION # 38
In documentation for MRP in Advanced Planning you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?
- A. MRP creates the capacity requirements without considering existing load on the work centers.
- B. MRP creates the capacity requirements at the earliest possible time.
- C. MRP assigns the capacity requirements automatically to work centers with the earliest available capacity.
- D. MRP assigns the capacity requirements automatically after the last scheduled operation for each work center.
Answer: D
NEW QUESTION # 39
What are the prerequisites for a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Activating the reporting point backflush in the work centers
- B. Defining the operations as reporting points using the control key
- C. Defining the relevant work centers in the routing
- D. Activating the reporting point backflush in the order dependent parameters
Answer: A,B
NEW QUESTION # 40
Which information is required when you create a product master in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. Base unit of measure
- B. Product type
- C. Selection screen for plants
- D. Selection screen for views
Answer: A,B
Explanation:
When you create a product master in SAP S/4HANA, you need to enter values for mandatory fields such as product number, product type, base unit of measure, and description. The product type determines the category of the product, such as material, service, or article. The base unit of measure defines the unit in which you manage the product in all business transactions. The selection screen for views and plants are optional fields that allow you to choose which views and plants you want to maintain for the product master. Reference: Creating Products, Understanding the Concept of Master Data
NEW QUESTION # 41
What can you use stard heuristics in Advanced Planning (PP/DS) for?
- A. To solve planning problems for defined objects
- B. To optimize costs times in production plans
- C. To set default values in production master data
- D. To automate material movements in material staging
Answer: A
NEW QUESTION # 42
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks? Note: There are 2 correct answers to this question.
- A. Use batch determination.
- B. Use the Batch Information Cockpit.
- C. Use batch derivation.
- D. Use the batch where-used list.
Answer: B,D
Explanation:
In SAP S/4HANA, when a raw material batch has a quality deviation and has been used in production, you can trace its impact on finished goods using batch management tools:
* Use the Batch Information Cockpit(B): The Batch Information Cockpit (transaction BMBC) provides a centralized view of batch data, including where-used information. By entering the raw material batch number, you can trace its usage through production orders (e.g., CO03) to identify all affected finished goods batches in stock (e.g., via the "Batch Usage" tab).
* Use the batch where-used list(C): The batch where-used list (transaction MB56 or embedded in MSC2N, "Batch Usage" function) tracks a batch's consumption across production orders or material movements (e.g., goods issue 261). It shows the hierarchy from the raw material batch to finished goods batches, pinpointing affected stock (e.g., in MMBE).
Batch determination(A) (e.g., in COB1) is for selecting batches during production or sales, not tracing past usage.Batch derivation(D) (Customizing, Logistics - General > Batch Management > Derivation) transfers batch attributes from raw to finished goods but doesn't identify affected stock retrospectively-it's a forward process. This is per SAP's batch traceability features.
NEW QUESTION # 43
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.
- A. Assign the overall profile to the authorization profile.
- B. Assign the alert profile to the overall profile.
- C. Create an object selection variant for alerts according to the priority of ATP categories.
- D. Create an object selection variant for productionplanningrelated alerts.
Answer: B,D
NEW QUESTION # 44
Which time elements can be reduced by a reduction strategy?
Note: There are 3 correct answers to this question.
- A. Float after production
- B. Move time
- C. Queue time
- D. Wait time
- E. Goods receipt processing time
Answer: B,C,D
Explanation:
A reduction strategy is a method of shortening the lead time of an order by reducing certain time elements in the order scheduling1. The time elements that can be reduced by a reduction strategy are move time, wait time, and queue time2. Move time is the time required to move a material from one operation to another. Wait time is the time between the end of an operation and the start of the next operation. Queue time is the time before an operation can start at a work center due to the work center's capacity utilization3. These time elements can be reduced by a percentage or a fixed value in the reduction strategy. Reference: 1: Reduction Strategy | SAP Help Portal(https://blog.sap-press.com/4-strategies-for-make-to-stock-production-with-sap-s4hana)2: 4 Strategies for Make-to-Stock Production with SAP S/4HANA(https://blogs.sap.com/2022/03/22/highlights-for-manufacturing-in-sap-s-4hana-2021-part-2-production-planning-engineering-operations/)3: Scheduling | SAP Help Portal(https://blogs.sap.com/2022/04/26/manufacturing-in-sap-s-4hana-cloud-planning-strategies/).
NEW QUESTION # 45
What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement?
- A. The MRP run assumes in-house production.
- B. The MRP run does NOT consider the material; it has to be planned interactivelty
- C. The MRP run assumes external procurement.
- D. The MRP run plans the material only if a quotation has been maintained.
Answer: B
Explanation:
If you have created a new MRP-relevant material that supports both in-house production and external procurement, you need to specify the procurement type for the material in the material master record. The procurement type determines how the material is procured, either in-house, externally, or both. If you do not specify the procurement type, the MRP run does not consider the material, and it has to be planned interactively using the MRP Live app or the MD04 transaction. In interactive planning, you can manually assign a procurement type to the material and create the corresponding order proposals, such as planned orders or purchase requisitions. Alternatively, you can maintain a production version for the material, which defines the procurement type and the BOM and routing to be used for in-house production or external procurement. The production version can be assigned to the material in the material master record or in the MRP Live app or the MD04 transaction. The production version allows the MRP run to plan the material automatically based on the specified procurement type123. Reference: Procurement Type | SAP Help Portal, Production Version | SAP Help Portal, Material Requirements Planning with SAP S/4HANA, page 79-80.
NEW QUESTION # 46
Which standard item categories can you select inside a bill of material (BOM)?
Note: There are 2 correct answers to this question
- A. Non-stock item
- B. WBS item
- C. Work item
- D. Variable-size item
Answer: A,D
Explanation:
You can select the following standard item categories inside a bill of material (BOM):
Variable-size item: This item category is used for materials that have variable dimensions, such as pipes, wires, or fabrics. The system calculates the quantity of the variable-size item based on the formula and the dimensions entered in the BOM. You can also use the variable-size item to define a scrap percentage for the material.
Non-stock item: This item category is used for materials that are not managed in inventory, such as consumables, services, or subcontracting items. The system does not create any reservations or stock movements for the non-stock item. You can use the non-stock item to trigger purchasing requisitions or purchase orders for the material. Reference: Bill of Material Item Category; Bills of Material in Production Planning
NEW QUESTION # 47
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.
- A. 100% check
- B. Manual maintenance
- C. Simultaneous
- D. First in first out (FIFO)
Answer: A,B
NEW QUESTION # 48
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from depender Note: There are 2 correct answers to this question.
- A. Total replenishment lead time
- B. Inhouse production time
- C. Operation duration
- D. Planned delivery time
Answer: B,D
NEW QUESTION # 49
......
Actual Questions Answers Pass With Real C-TS422-2023 Exam Dumps: https://www.trainingdump.com/SAP/C-TS422-2023-practice-exam-dumps.html
C-TS422-2023 Dumps Prepare Your Exam With 82 Questions: https://drive.google.com/open?id=1iMM8nKqYGwJlKUr9YXHGb1eOCguNNSd3