Check Real Huawei H12-425_V2.0 Exam Question for Free (2024)
Get Ready to Boost your Prepare for your H12-425_V2.0 Exam with 468 Questions
NEW QUESTION # 116
At present, in the design of the data center, the part ( ) that most affects the PUE.
- A. Decoration system
- B. Building Systems
- C. Power supply and distribution system
- D. Refrigeration system
Answer: D
NEW QUESTION # 117
UPS5000-A supports the adjustable number of battery cells, which avoids the replacement of a whole group caused by a single battery failure, and solves the problem of difficult maintenance of traditional UPS batteries in the range of 30-40 cells.
- A. False
- B. True
Answer: B
NEW QUESTION # 118
When the maintenance engineer arrives at the customer site, he should make a record of the working environment around the site. What are the main collection items? (Multiple choice)
- A. Ambient temperature
- B. Ventilation
- C. Equipment installation distance
- D. Whether the surrounding environment is bad (such as dust or humidity)
Answer: A,B,C,D
NEW QUESTION # 119
Which of the following options belongs to the natural cooling system?
- A. Air-cooled upright is an air-conditioning system
- B. Water-cooled air-conditioning series
- C. Water-cooled cold water air series
- D. Direct Ventilation Air Conditioning System
Answer: D
NEW QUESTION # 120
UPS5000-S has the function of adjusting the number of battery cells, which avoids the replacement of the whole group caused by the failure of a single battery, and solves the problem of difficult maintenance of traditional UPS batteries. UPS5000-s supports 30-46 battery adjustable.
- A. False
- B. True
Answer: B
NEW QUESTION # 121
UPS5000-E (50kVA module) series UPS does not derate backup power, the number of 12V batteries in the following configuration, which is unreasonable?
- A. Section 38
- B. Section 40
- C. Section 34
- D. Section 36
Answer: B
NEW QUESTION # 122
What are the reasons why Fusionlodule500 & FusionModule800 are generally recommended to customers for typical configuration solutions? (Multiple choice)
- A. Typical configuration solutions are better than customized solutions
- B. The existing typical configuration scheme can basically cover most of the small computer room usage scenarios
- C. The typical configuration scheme has a shorter lead time than the customized scheme
- D. Typical solutions are more competitive
Answer: A,B,C,D
NEW QUESTION # 123
A system is configured with 15min battery backup time, and the discharge termination voltage of the battery cell should select?
- A. 1.75V
- B. 1.60V
- C. 1.80V
- D. 1.67V
Answer: A
NEW QUESTION # 124
Configure the cables of the UPS. The total current carrying capacity of the cables is greater than the rated current of the UPS to meet the requirements of the project.
- A. False
- B. True
Answer: B
NEW QUESTION # 125
A NetCol5000-A compressor cannot run, what are the possible reasons? (Multiple choice)
- A. Damaged compressor motor
- B. High voltage switch action
- C. Compressor circuit breaker open
- D. Indoor fan failure
Answer: A,B,C,D
NEW QUESTION # 126
Which of the following contents does NETCOL5000-A maintain for the electrode humidifier without dismantling the humidifying barrel? (Multiple choice)
- A. Check whether the humidifier solenoid valve control works normally
- B. Check the manual drain of the humidifier
- C. Check that the humidification electrode is fully inserted into the humidification bucket and there is no exposed part
- D. Confirm that there is no abnormality in the water supply and drainage of the humidifier
Answer: A,B,C,D
NEW QUESTION # 127
If the UPS5000-E is overloaded in normal mode, it transfers to bypass mode immediately. The bypass supplies power to loads to protect the UPS.
- A. False
- B. True
Answer: A
NEW QUESTION # 128
A UPS system is configured with a single 50mm "2 (209A) cable, and the maximum current capacity allowed by the system is?
- A. 174A
- B. 209A
- C. 104A
- D. 160A
Answer: B
NEW QUESTION # 129
What can users do through the ECC800WEB interface? (Multiple choice)
- A. Query version information
- B. Export historical data
- C. Software Upgrade
- D. Real-time monitoring of equipment status
Answer: A,B,C,D
NEW QUESTION # 130
UPS2000-G- (6-20KVA) battery is not connected, which does not affect the normal power supply of the system.
- A. False
- B. True
Answer: B
NEW QUESTION # 131
For FusionModule2000, depending on different layout position, batteries can be deployed in the smart module or out of the smart module.
- A. False
- B. True
Answer: B
NEW QUESTION # 132
The ECC800 is equipped with a SIM card, the SIM card should be installed in ().
- A. ECC800 power module slot
- B. The slot on the left side of the ECC800 main control module
- C. Below the ECC800 antenna
- D. USB interface
Answer: B
NEW QUESTION # 133
The user can modify the IP address of the ECC800 from the () menu on the ECC800WEB interface.
- A. Monitoring module IP
- B. Micro module settings
- C. Time setting
- D. Video IP settings
Answer: A
NEW QUESTION # 134
UPS5000-series modular UPS product features are similar to which of the following product models?
- A. NXr
- B. APM
- C. Hipulse-u
- D. 80-NET
Answer: B
NEW QUESTION # 135
UPS5000-E can accept the input voltage within the range of ( ) V.
- A. 138-485
- B. 305-485
- C. 120-480
- D. 140-490
Answer: A
NEW QUESTION # 136
If the customer has high requirements on the availability of the management system and requires that the normal use of the system is not affected by a single point of failure of the hardware, the NetEco management system can provide a high-availability solution of dual-system backup. In the dual-computer solution, what hardware resources are required by NetEco?
- A. 1 server + 1 t-disk array + 2 switches
- B. 2 servers + 1 disk array + 1 switch
- C. None of the above is true
- D. 2 servers + 2 disk arrays + 3 switches
Answer: D
NEW QUESTION # 137
......
Huawei H12-425_V2.0 (HCIP-Data Center Facility Deployment V2.0) Exam is designed to test the technical knowledge and skills of IT professionals who are involved in the deployment and management of data center facilities. HCIP-Data Center Facility Deployment V2.0 certification exam is intended for individuals who have experience in data center design, implementation, and maintenance. It is also suitable for those who are responsible for the planning and deployment of data center facilities.