NEW QUESTION 25
You define fixing for a key figure.Which of the following functions are available for this key figure? Note:
There are 2 correct answers to this question.

  • A. Fixing is possible for a certain quantity of a key figure value.
  • B. Fixing is possible for system editable key figures.
  • C. Fixing is possible for a certain period, including all child values in the hierarchy.
  • D. Fixing is possible for manually editable key figures.

Answer: B,C

 

NEW QUESTION 26
You are setting up planing with lot sizes.What are some of the properties of lot sizes that you need to be aware of?Note: There are 2 correct answers to this question.

  • A. Lot sizes are applicable for production and transportation quantities.
  • B. Lot sizes are time-independent master data settings.
  • C. Periodic lot size setting overrides the minimum lot size.
  • D. Lot sizes are applicable for production and handling quantities.

Answer: B,D

 

NEW QUESTION 27
Which of the following are functions of SAP IBP for demand? Note: There are 3 correct Answers to this question.

  • A. Demand sensing of demand data using the supply chain algorithm library
  • B. Demand sensing of demand data using predictive analytics tools
  • C. Detailed statistical analysis of demand data using the supply chain algorithm library
  • D. Detailed statistical analysis of demand data using predictive analytics tools
  • E. Embedded, on-the-fly demand analytics

Answer: A,D,E

 

NEW QUESTION 28
What are the ways to achieve rolling aggregation with SAP IBP?

  • A. Using key figure calculation
  • B. Using aggregation mode average
  • C. Using local member
  • D. Using attribute as a key figure

Answer: B

 

NEW QUESTION 29
Which of the following conditions are relevant for subtotals in the planning view? Note: There are 2 correct Answers to this question.

  • A. The values of the attribute-based total at the highest attribute level in the planning level can be changed.
  • B. The total number of attributes that can use subtotals in the planning view can be restricted.
  • C. The total value can be added before or after the selected attribute.
  • D. Only attribute-based totals can be added to the planning view.

Answer: B,C

 

NEW QUESTION 30
Which of the following are valid use cases for using the Realignment App?Note: There are 2 correct answers to this question.

  • A. Removing outliers from the sales history of a reference product before transferring its sales to a new product
  • B. Merging two locations into a new location
  • C. Changing customer sources and reassigning customers to new DCs
  • D. Using the realignment run to identify obsolete data

Answer: B,C

 

NEW QUESTION 31
What function would you use to configure a year-to-date calculation?

  • A. Cumulative Aggregation
  • B. Last Period Aggregation
  • C. Rolling Aggregation
  • D. Dynamic Rolling Aggregation

Answer: A

 

NEW QUESTION 32
What is a prerequisite for modeling outsourced manufacturers with production capacity using the Supply Optimizer?

  • A. Model relative production costs across internal locations and outsourced manufacturing locations
  • B. Use production lead times and offsets to manage components at the outsourced manufacturing location
  • C. Ensure that the outsourced manufacturing locations have a separate subnetwork
  • D. Model target inventory and stocks at the outsourced manufacturing location

Answer: A

 

NEW QUESTION 33
You are modeling a new product introduction.Which of the following steps can be part of your modeling process in the Manage Product Lifecycle app?Note: There are 2 correct answers to this question.

  • A. Enter the product family to which the new product belongs
  • B. Copy the launch dimension from the reference product to the new product
  • C. Enter the Phase-out Start Date and Phase-out End Date
  • D. Create planning objects for new combinations in the app

Answer: B,D

 

NEW QUESTION 34
You created a key figure and want to add calculations. Which of the following rules do you consider?
Note: There are 2 correct Answers to this question.

  • A. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation U level.
  • B. The calculation chain for a key figure must always result in a calculated key figure.
  • C. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
  • D. Key figures can be calculated across different planning levels.

Answer: C,D

 

NEW QUESTION 35
What are S&OP operator (optimizer) parameters associated with demand fair share?

  • A. You want to copy a custom planning area that was built during the SAP IBP implementation to model a separate process.
  • B. Number of fair share segments. Additional tiering costs (default). Target inventory violation cost
  • C. Number of fair share segments. Maximum days of coverage. Number of fair share segments late delivery
  • D. Number of fair share segments. Maximum inventory. Additional tiering costs (default)
  • E. Number of fair share segments. Additional tiering costs (default). Number of fair share segments late delivery

Answer: E

 

NEW QUESTION 36
Which supply chain challenge is addressed by SAP IBP for demand?

  • A. Inability to understand and shape actual demand
  • B. Inability to respond to short-term changes in supply and demand
  • C. Inability to synchronize supply and demand
  • D. Inability to arrive at consensus demand

Answer: A

 

NEW QUESTION 37
You are working with inventory key figures.What are some of the business scenarios where you can use the Last Period Aggregation function?Note: There are 2 correct answers to this question.

  • A. Calculating the value of inventory on any time profile level ensuring flexibility of calculation
  • B. Search for and return the last not null value of the inventory key figure
  • C. Calculating the value of inventory on a weekly basis, using static aggregation from the daily level
  • D. Calculating how many periods inventory is going to last based on the planned demand

Answer: B,D

 

NEW QUESTION 38
You have set up a planning area and data is available. You adjust the necessary time profile settings and run the consistency check. Which settings can you change and still run a successful consistency check?
Note: There are 2 correct Answers to this question.

  • A. Change the description of the attributes in the time profile.
  • B. Change the past and future horizon of the levels in the time profile.
  • C. Add a new time profile level to the time profile.
  • D. Remove an attribute assigned to the time profile level if the attribute is used in a planning level.

Answer: A,B

 

NEW QUESTION 39
Which of the following modes can you use when creating a constrained plan? Note: There are 2 correct Answers to this question.

  • A. Production maximization
  • B. Profit maximization
  • C. Delivery maximization
  • D. Resource maximization

Answer: B,C

 

NEW QUESTION 40
What are some of the prerequisites for configuring a planning area that results in a successful consistency check? Note: There are 2 correct Answers to this question.

  • A. Configure at most two input key figures on the same planning level in a key figure calculation.
  • B. Configure at least one calculated key figure for the planning area.
  • C. Assign the compound master data type and its component master data types.
  • D. Specify a planning horizon in the planning area for each level of the assigned time profile.

Answer: C,D

 

NEW QUESTION 41
Which of the following are examples of time-independent key figures?Note: There are 2 correct answers to this question.

  • A. A currency conversion key figure, such as exchange rate
  • B. A unit of measure key figure, such as UOMCONVERSIONFACTOR
  • C. A special key figure marked as an aggregate key figure (aggregate constraint)
  • D. A forecast metric key figure, such FCSTMAPE

Answer: B,C

 

NEW QUESTION 42
Which of these conditions must be met to create a Local Member key figure?

  • A. A key figure is selected in the Key Figures tab in the Microsoft Excel add-in.
  • B. A key figure is created in the Planning Area app.
  • C. Activate Local Member Recognition is selected.
  • D. Use Excel Cell References in Report Editor is selected.

Answer: C

 

NEW QUESTION 43
......


SAP C_IBP_2205 Exam Description:

The "SAP Certified Application Associate - SAP IBP for Supply Chain (2205)" certification exam verifies that the candidate possesses the basic knowledge in the area of the SAP supply chain planning. This certificate proves that the candidate has a basic overall understanding within this consultant profile of the industry solutions, and can implement this knowledge practically in projects under guidance of an experienced consultant. It is recommended as an entry-level qualification to allow consultants to get acquainted with the fundamentals of SAP Integrated Business Planning. Please note that this 2205 version of the exam takes part in the Stay Current with SAP Global Certification program. Once you pass this version of the exam, make sure that you start your stay current process. You will be required to take the quarterly stay current assessment for all subsequent SAP IBP releases via the SAP Learning Hub starting with the 2205 release to maintain your SAP IBP consultant certification status and badge. In order to participate in the stay current program and access the stay current enablement and assessment, you will need at minimum an SAP Learning Hub, edition for IoT and Digital Supply Chain subscription. (https://training.sap.com/learninghub)

 

Valid C_IBP_2205 Dumps for Helping Passing SAP Exam: https://www.trainingdump.com/SAP/C_IBP_2205-practice-exam-dumps.html

Download Free SAP C_IBP_2205 Exam Questions & Answer: https://drive.google.com/open?id=1K6yCZ1bSSD-cY5vOLByVb8QmLt7OCFQg

0
0
0
0