You plan to conduct a manual test for an ASP.NET website by using Microsoft Test Manager (MTM). You create a test plan named Calculate_Margin by using Testing Center in MTM.
You need to link all the test cases that belong to the Calculate_Margin test plan with new requirements that are stored as work items in Team Foundation Server 2012.
What should you do?
You need to link all the test cases that belong to the Calculate_Margin test plan with new requirements that are stored as work items in Team Foundation Server 2012.
What should you do?
Correct Answer: A
You are using Microsoft Test Manager (MTM).
A test case is already in production.
You need to modify the test case to indicate it is being reworked.
What should you do?
A test case is already in production.
You need to modify the test case to indicate it is being reworked.
What should you do?
Correct Answer: C
You are using Microsoft Visual Studio 2012 to manage test environments for your company.
You need to set up a two-computer environment for running tests. The environment needs to include:
- A client computer running Windows 7 and - A server computer running Windows Server 2008 R2 SP 1, which acts as the web server and the database server.
The server computer has already been created using Microsoft System Center Virtual Machine Manager (SCVMM).
You need to create a lab environment for testing this configuration.
What should you do?
You need to set up a two-computer environment for running tests. The environment needs to include:
- A client computer running Windows 7 and - A server computer running Windows Server 2008 R2 SP 1, which acts as the web server and the database server.
The server computer has already been created using Microsoft System Center Virtual Machine Manager (SCVMM).
You need to create a lab environment for testing this configuration.
What should you do?
Correct Answer: B
HOTSPOT
You are finalizing the setup of your Microsoft Visual Studio Team Foundation Server (TFS) deployment. The deployment includes SQL Server Reporting Services and Analysis
Services, as well as Microsoft SharePoint Products.
You need to audit your infrastructure in order to confirm that the servers are provisioned
within your TFS deployment.
Your audit worksheet is displayed in the following table.

Complete your audit for the Application Areas and required servers presented in the table. Use the drop-down menus to select the answer choice that completes each statement.

You are finalizing the setup of your Microsoft Visual Studio Team Foundation Server (TFS) deployment. The deployment includes SQL Server Reporting Services and Analysis
Services, as well as Microsoft SharePoint Products.
You need to audit your infrastructure in order to confirm that the servers are provisioned
within your TFS deployment.
Your audit worksheet is displayed in the following table.

Complete your audit for the Application Areas and required servers presented in the table. Use the drop-down menus to select the answer choice that completes each statement.

Correct Answer:

DRAG DROP
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server with one project collection and multiple build machines.
A development team installs and configures a build service on a new build machine.
You need to be able to validate that the installation and configuration meets your organization's requirements and follows its best practices.
At which service would you perform the following tasks? (To answer, drag the appropriate build component to the correct standards- checking task in the answer area. Each build component may be used once, more than once, or not at all.)

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server with one project collection and multiple build machines.
A development team installs and configures a build service on a new build machine.
You need to be able to validate that the installation and configuration meets your organization's requirements and follows its best practices.
At which service would you perform the following tasks? (To answer, drag the appropriate build component to the correct standards- checking task in the answer area. Each build component may be used once, more than once, or not at all.)

Correct Answer:

You are using Microsoft Test Manager (MTM).
You need to develop test cases that trace to a set of requirements.
What should you do?
You need to develop test cases that trace to a set of requirements.
What should you do?
Correct Answer: D
Your development team is using the Microsoft Solution Framework (MSF) for Capability Maturity Model Integration (CMMI) Process Improvement 6.0 process template.
The team has identified all of the acceptance criteria for a new application. This data currently resides in a series of spreadsheets.
You need to enter the criteria into TFS for team traceability and tracking.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)
The team has identified all of the acceptance criteria for a new application. This data currently resides in a series of spreadsheets.
You need to enter the criteria into TFS for team traceability and tracking.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)
Correct Answer: B,D
Your network environment includes a multi-tier Microsoft Visual Studio Team Foundation Server (TFS) 2012 server implementation. Developers use Visual Studio 2012.
Your team has just started developing a very large enterprise-scale application.
You need to create a workspace for the new project that meets the following requirements:
- Developers should be able to use Visual Studio 2012 and earlier versions to work with the workspace. - Performance of the workspace should not be degraded when the number of items in the workspace increases. - The storage utilization of the developer local hard drive should be as minimal as possible.
What should you do?
Your team has just started developing a very large enterprise-scale application.
You need to create a workspace for the new project that meets the following requirements:
- Developers should be able to use Visual Studio 2012 and earlier versions to work with the workspace. - Performance of the workspace should not be degraded when the number of items in the workspace increases. - The storage utilization of the developer local hard drive should be as minimal as possible.
What should you do?
Correct Answer: B
Business analysts in your organization create large, extremely detailed requirements specifications.
Some business analysts report that developers are not delivering according to specifications.
You need to improve requirements management and delivery.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)
Some business analysts report that developers are not delivering according to specifications.
You need to improve requirements management and delivery.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)
Correct Answer: B,C
HOTSPOT
You are a software developer for Contoso, Ltd. Microsoft Visual Studio Team Foundation Server (TFS) manages your code and project artifacts. The root of the project is S/Contoso/Main.
You work primarily in the $/Contoso/Main/Website folder and below it. You do not want a copy of the folder $/Contoso/Main/Website/Images due to its size.
You need to maximize your workspace for efficiency by minimizing the number of files you pull from the server.
In the table below, select which folder should be mapped as cloaked and which as active. Make only one selection in each column.

You are a software developer for Contoso, Ltd. Microsoft Visual Studio Team Foundation Server (TFS) manages your code and project artifacts. The root of the project is S/Contoso/Main.
You work primarily in the $/Contoso/Main/Website folder and below it. You do not want a copy of the folder $/Contoso/Main/Website/Images due to its size.
You need to maximize your workspace for efficiency by minimizing the number of files you pull from the server.
In the table below, select which folder should be mapped as cloaked and which as active. Make only one selection in each column.

Correct Answer:

DRAG DROP
Your team uses Microsoft Visual Studio Team Foundation Server (TFS) to manage automated builds.
You need to make modifications to one of your build definitions. You want your team to be able to queue new builds, but you want those builds to run only after you complete your changes.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Your team uses Microsoft Visual Studio Team Foundation Server (TFS) to manage automated builds.
You need to make modifications to one of your build definitions. You want your team to be able to queue new builds, but you want those builds to run only after you complete your changes.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Correct Answer:

DRAG DROP
You are a test developer using Microsoft Test Manager (MTM).
You are editing a test plan for a product.
You need to supply a new custom configuration variable in the configuration setting for one
of the test cases.
In which order should you perform the actions in MTM? To answer, move all actions from
the list of actions to the answer area and arrange them in the correct order.

You are a test developer using Microsoft Test Manager (MTM).
You are editing a test plan for a product.
You need to supply a new custom configuration variable in the configuration setting for one
of the test cases.
In which order should you perform the actions in MTM? To answer, move all actions from
the list of actions to the answer area and arrange them in the correct order.

Correct Answer:

You are using Microsoft Test Manager (MTM) to run manual tests.
Testers reported a bug during a test run on the V1.0 build. A build for V2.0 has been created. Testers are still running tests against the V1.0 build.
You need to verify that the bug has been fixed in build V2.0.
What should you do?
Testers reported a bug during a test run on the V1.0 build. A build for V2.0 has been created. Testers are still running tests against the V1.0 build.
You need to verify that the bug has been fixed in build V2.0.
What should you do?
Correct Answer: A
Your network environment is configured according to the following table:

The data tier is configured to use SQL Server Reporting Services (SSRS) and SQL Server Analysis Services (SSAS). The data tier currently does not contain a database named TFS_Analysis.
You need to rebuild the data warehouse, including the SSRS and SSAS databases.
What should you do?

The data tier is configured to use SQL Server Reporting Services (SSRS) and SQL Server Analysis Services (SSAS). The data tier currently does not contain a database named TFS_Analysis.
You need to rebuild the data warehouse, including the SSRS and SSAS databases.
What should you do?
Correct Answer: A