GAQM Certified Lean Six Sigma Green Belt (CLSSGB) - CLSSGB-001 Exam Practice Test
The deviation of the measured value from the actual value is known as _____________.
Correct Answer: D
The essence of Lean is to concentrate effort on removing waste while improving process flow to achieve speed and agility at lower cost.
Correct Answer: A
When utilizing Statistics the population is defined as a collection of all the individual data points of interest.
Correct Answer: A
When two Inputs have an impact on the Output together yet seem to have no or little impact on their own this is called a/an ________________.
Correct Answer: B
A 1-Sample t-test is used when you want to compare the Median of one distribution to a target value.
Correct Answer: B
Customers make a purchase decision based on a number of factors. In Lean Six Sigma we refer to these decision points as CTQ's or as ____________________.
Correct Answer: C
The actual experimental response data varied somewhat from what a Belt had predicted them to be. This is the result of which of these?
Correct Answer: C
Training cost is $4,000 and a project required an initial investment of $30,000. If the project yields monthly savings of $2,000 beginning after 3 months, what is the payback period in months (before money costs and taxes)?
Correct Answer: A
The term FMEA is an abbreviation for Failures Measure Effective Automation.
Correct Answer: B
The purpose of a Process Map is to identify the complexity of the process and to record all actions and decision points in the process.
Correct Answer: A
Fractional Factorial designs for an experimental approach are used when ____________ about the multiple metric interaction in a process.
Correct Answer: D
When it comes to Control one of the most effective means of eliminating defects is to _________________ .
Correct Answer: A
A Lean Principle that addresses efficiency by the process worker is called ____________________?
Correct Answer: A