
C-TS422-2020 Actual Questions Answers PDF 100% Cover Real Exam Questions
C-TS422-2020 Exam questions and answers
SAP S/4HANA Production Planning and Manufacturing Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books | Weighting |
|---|---|---|
| Material Requirements Planning in SAP S/4HANA | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
| Capacity Planning in SAP S/4HANA | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
| Production Orders in SAP S/4HANA | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Demand Management in SAP S/4HANA | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Lean Manufacturing in SAP S/4HANA | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
| Master Data in SAP S/4HANA | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. TS421, TS422 (SAP S/4HANA 2020) | > 12% |
NEW QUESTION 17
Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.
- A. Implementation
- B. Planning
- C. Engineering change management
- D. Inspection during production
Answer: A,B
NEW QUESTION 18
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. Thedeletion flag must NOT be set for the bill of materials (BOM) or the routing.
- B. The lot size range must be within the lot-size range of the assigned routing.
- C. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- D. The assigned routing must NOT have alternative sequences.
- E. The assigned routing must be a rate routing.
Answer: A,B,C
NEW QUESTION 19
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.
- A. SAP SuccessFactors
- B. SAP Ariba
- C. SAP Concur
- D. SAP Field glass
- E. SAP C/4HANA
Answer: B,C,D
NEW QUESTION 20
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?
- A. It is converted into a schedule line.
- B. It is converted into a production order.
- C. It is converted into a reservation.
- D. It is converted into a planned order.
Answer: C
NEW QUESTION 21
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.
- A. Plant
- B. Work center
- C. Material
- D. Production version
Answer: B,C
NEW QUESTION 22
What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Installation point
- B. Scrap percentage
- C. Quantity
- D. Item type
Answer: A,C
NEW QUESTION 23
What is the difference between co-products and by-products?
- A. Only by-products have a zero inventory valuation.
- B. Onlyco-products can be manufactured in isolation from the main product.
- C. Only co-products appear in the processor production order settlement rule.
- D. Only co-products are identified by a special item category in the bill of material (BOM).
Answer: C
NEW QUESTION 24
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?
- A. Kanban
- B. Picking list
- C. Transfer Order
- D. Backflushing
Answer: B
NEW QUESTION 25
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stockis zero and the discontinuation date is in the past?
- A. Kanban
- B. Material requirements planning
- C. Production order release
- D. Back flushing
Answer: B
NEW QUESTION 26
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Functional Location BOM
- B. Class BOM
- C. Work Center BOM
- D. Sales Order BOM
Answer: A,D
NEW QUESTION 27
A material has been set up as a phantomassembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?
- A. Change the item category of the phantom assembly in the BOM.
- B. Change the explosion type of the phantom assembly in the BOM.
- C. Change the phantom item indicator for the phantom assembly in the BOM.
- D. Change the special procurement key of the phantom assembly in the BOM.
Answer: B
NEW QUESTION 28
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?
- A. Plant Data
- B. MRP Profile
- C. MRP Controller
- D. MRP Group
Answer: D
NEW QUESTION 29
What is a work center hierarchy in SAP S/4HANA capacity planning?
- A. A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
- B. A group of work centers in a production line beingused in sequence for production
- C. A group of alternative work centers providing a cumulative available capacity for production
- D. A group of alternative work centers for production, structured in hierarchy levels by prior ties
Answer: C
NEW QUESTION 30
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?
- A. Resource network
- B. Setup matrix
- C. Work center hierarchy
- D. Operation network
Answer: C
NEW QUESTION 31
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planned order is converted to a production order.
- B. The planned order's components are copied from the picking list.
- C. The planned order's component availability is checked
- D. The planned order generates capacity requirements.
Answer: D
NEW QUESTION 32
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are2 correct answers to this question.
- A. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
- B. In Customizing you can decide by material type whether to use the long material number.
- C. The display template for material numbers applies to all clients.
- D. The number of leading zeros for internal numbers is client-specific.
Answer: A,C
NEW QUESTION 33
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
- A. To make the assignment of components easier
- B. To reduce the number of changes required in bills of material
- C. To increase the number of planning levels
- D. Tosimplify the structure of bills of material
- E. To reduce the number of material masters
Answer: A,B,D
NEW QUESTION 34
You want to create a production order from a planned order. What methods could you use? Note: There are 2 correct answers to this question.
- A. Individualconversion
- B. Full conversion
- C. Partial conversion
- D. Order release
Answer: B,C
NEW QUESTION 35
Duringproduction order creation, several valid production versions are found. How does the system choose the product conversion?
- A. Lot size or material cost
- B. Validity period or sales order
- C. Planned order or materialnumber
- D. Alphanumeric or quota arrangement
Answer: D
NEW QUESTION 36
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.
- A. Create object selection variant for transportation lane-related alerts.
- B. Create object selection variant for product-related alerts.
- C. Assign the alert profile to the overall profile.
- D. Create object selection variant for resource-related alerts
- E. Assign the overall profile to the authorization profile.
Answer: B,C,D
NEW QUESTION 37
......
C-TS422-2020 Exam Certification Details:
| Cut Score: | 56% |
| Duration: | 180 mins |
| Exam: | 80 questions |
| Level: | Associate |
| Languages: | English |
TrainingDump C-TS422-2020 Exam Practice Test Questions : https://www.trainingdump.com/SAP/C-TS422-2020-practice-exam-dumps.html
Pass C-TS422-2020 Exam Info and Free Practice Test : https://drive.google.com/open?id=1cNn8T4JTpxhrLZTAUwBWvdXsdkqJAZY1