Pass SAP C_TS422_1909 exam questions - convert Test Engine to PDF [Q15-Q31]

Share

Pass SAP C_TS422_1909 exam questions - convert Test Engine to PDF

Pass Your C_TS422_1909 Exam Easily - Real C_TS422_1909 Practice Dump Updated Jan 24, 2022


SAP C_TS422_1909 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Differentiate consumption-based planning vs. MRP, outline new trends in production planning
  • Configure availability check for components
Topic 2
  • Describe the SAP HANA database concept and new user experience with SAP Fiori
  • Identify and explain production relevant master data
Topic 3
  • Outline best practices for using SAP S/4HANA
  • Production Orders in SAP S/4HANA
Topic 4
  • Outline both motivation and background of SAP S/4HANA
  • Determine BOM item category
  • Describe order status management and set user statuses
Topic 5
  • Explain and compare the different production methods in make-to-order
  • Outline the basics and master data of advanced planning
Topic 6
  • Introduction to SAP S/4HANA Production Planning
  • Outline production planning components and functions
Topic 7
  • Identify repetitive manufacturing specific master data
  • Apply material staging and confirmation
Topic 8
  • Explain line load planning and confirmation
  • outline the capabilities of embedded analytics
Topic 9
  • Introduction to SAP S/4HANA Supply Chain Planning
  • Material Requirements Planning in SAP S/4HANA
Topic 10
  • Select and apply planning strategies, use the planning table
  • Advanced Planning in SAP S/4HANA


C_TS422_1909 Exam Certification Details:

Level:Associate
Languages:German, English, French, Chinese
Duration:180 mins
Exam:80 questions
Sample Questions: SAP C_TS422_1909 Exam Sample Question
Cut Score:55%

 

NEW QUESTION 15
Your customer complains about incorrect duration for production order operations. What time elements could cause the issue?
There are 3 correct answers to this question.
Response:

  • A. Processing time
  • B. Tear down time
  • C. Floating time
  • D. Move time
  • E. Queue time

Answer: C,D,E

 

NEW QUESTION 16
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders?
There are 2 correct answers to this question.
Response:

  • A. Work center
  • B. Bill of material
  • C. Material master
  • D. Routing header

Answer: B,C

 

NEW QUESTION 17
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.

  • A. Production orders are created with sales order reference.
  • B. Sales order-specific stock is created
  • C. Sales order-specific planning run is required.
  • D. Storage location MRP areas are required.
  • E. Net requirements calculation is sales order-specific.

Answer: A,B,E

 

NEW QUESTION 18
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?

  • A. When you create a sales order
  • B. When you deliver a sales order
  • C. When the MRP results are saved
  • D. When you create a planned order

Answer: A

 

NEW QUESTION 19
Which reports can you access via the order and resource reporting transaction in advanced planning?
There are 3 correct answers to this question.
Response:

  • A. Operation list
  • B. Production overview
  • C. Production list
  • D. Planning file entries
  • E. WIP list

Answer: A,B,E

 

NEW QUESTION 20
What determines whether the planned independent requirements in MRP consume other requirements?

  • A. Requirements profile
  • B. Order type
  • C. Consumption sequence procedure
  • D. Requirements type

Answer: D

 

NEW QUESTION 21
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are 2 correct answers to this question.

  • A. In Customizing you can decide by material type whether to use the long material number.
  • B. The display template for material numbers applies to all clients.
  • C. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
  • D. The number of leading zeros for internal numbers is client-specific.

Answer: B,C

 

NEW QUESTION 22
You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order.
Which is the appropriate planning strategy to use?
Please choose the correct answer.
Response:

  • A. Make-to-order production (20)
  • B. Planning without final assembly (50)
  • C. Production by lot size (30)
  • D. Planning with final assembly (40)

Answer: B

 

NEW QUESTION 23
What are the three transition scenarios for an S/4HANA implementation?
There are 3 correct answers to this question.
Response:

  • A. System conversion
  • B. Landscape transformation
  • C. System upgrade
  • D. New implementation
  • E. System activation

Answer: A,B,D

 

NEW QUESTION 24
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?
Please choose the correct answer.
Response:

  • A. Quota arrangement
  • B. Delivery date
  • C. Costs
  • D. Component availability
  • E. Vendor rating

Answer: A

 

NEW QUESTION 25
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Work center hierarchy
  • B. Resource network
  • C. Operation network
  • D. Setup matrix

Answer: A

 

NEW QUESTION 26
What is a work center hierarchy in SAP S/4HANA capacity planning?

  • A. A group of alternative work centers for production, structured in hierarchy levels by prior ties
  • B. A group of work centers in a production line being used in sequence for production
  • C. A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
  • D. A group of alternative work centers providing a cumulative available capacity for production

Answer: D

 

NEW QUESTION 27
Which of the following are capabilities of multidimensional reporting in SAP S/4HANA embedded analytics?
There are 3 correct answers to this question.
Response:

  • A. Filters
  • B. Sort
  • C. Forecast
  • D. Scheduling
  • E. Drilldown

Answer: A,B,E

 

NEW QUESTION 28
Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.
Response:

  • A. Parallel processing across servers
  • B. MRP list
  • C. Planning horizon
  • D. Net change planning

Answer: D

 

NEW QUESTION 29
Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct answers to this question.
Response:

  • A. Concur
  • B. SAP Fieldglass
  • C. SAP Visual Enterprise
  • D. SAP Hybris
  • E. SAP Human Capital Management

Answer: A,B,D

 

NEW QUESTION 30
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.

  • A. Planning mode (bucket/sequence)
  • B. Direction (forward/backward)
  • C. Fixed pegging (on/off)
  • D. Finiteness level (0...1)
  • E. Scheduling control (finite/infinite)

Answer: A,B,E

 

NEW QUESTION 31
......


SAP C_TS422_1909 Exam Description:

The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.

 

C_TS422_1909 Real Exam Questions and Answers FREE: https://www.trainingdump.com/SAP/C_TS422_1909-practice-exam-dumps.html

0
0
0
0