The "SAP Certified Application Associate - SAP Maintenance & Repair with ERP 6.0 EHP7" certification exam verifies that the candidate possesses basic knowledge in the area of SAP Plant Maintenance. This certificate proves that the candidate has the required understanding within this consultant profile of the ERP solution, and can implement this knowledge practically in projects under guidance of an experienced consultant. It is recommended as an entry-level qualification to allow consultants to get acquainted with the fundamentals of SAP Maintenance & Repair.
NEW QUESTION 56
What does the maintenance plan category determine?
- A. The type of technical object for the maintenance plan
- B. The grouping of similar maintenance plans together for reporting
- C. How maintenance call objects are generated for a due maintenance call
- D. The type of maintenance call object the system generates for a due maintenance call
Answer: D
NEW QUESTION 57
What options are available in the maintenance order when you analyze costs using value categories? (Choose two)
- A. Display of costs by responsible work center
- B. Display of costs by individual operations
- C. Display of values in an alternate currency
- D. Summary of actual costs across multiple cost elements
Answer: B,D
NEW QUESTION 58
Identify the conditions required for Project work
There are 3 correct answers to this question.
Response:
- A. Ability to solve issues.
- B. Resource
- C. Time
- D. Completion
- E. Cost
Answer: B,C,E
NEW QUESTION 59
What are the 2 reasons of the maintenance Bill of Material
There are 2 correct answers to this question.
Response:
- A. Distribution
- B. Planning in task list
- C. Object identification
- D. Structuring of the object
- E. Clearance
Answer: B,D
NEW QUESTION 60
Which of the following item categories can you use in a Plant Maintenance bill of material (BOM)? (Choose two.)
- A. Assembly
- B. Non-stock material
- C. Stock material
- D. Equipment
- E. Functional location
Answer: B,C
NEW QUESTION 61
Which of the following control characters is available in the edit mask of the structure indicator?
Please choose the correct answer.
Response:
- A. M (alphanumeric characters)
- B. A (alpha characters)
- C. Y (special characters)
- D. D (numeric characters)
Answer: B
NEW QUESTION 62
All maintenance plans in your systems are scheduled automatically via deadline monitoring. What happens when you set a manual call?
Please choose the correct answer.
Response:
- A. The original scheduled dates of the maintenance plan remain.
- B. All scheduled calls on hold are deleted.
- C. All scheduled calls on hold are skipped.
- D. The waiting call dates are re-scheduled on the basis of the manual call.
Answer: A
NEW QUESTION 63
Identify the purpose for creating Bills of Material
There are 3 correct answers to this question.
Response:
- A. Processing
- B. Costing bill of material
- C. Structuring
- D. Production bill of material
- E. Design bill of material
Answer: B,D,E
NEW QUESTION 64
Your customer wants to generate costing for internal activities.
For which of the following can you define various rates in Activity Type/Price Planning transaction? (Choose three)
- A. Plan/actual version
- B. Value category
- C. Plant
- D. Period
- E. Cost center
Answer: A,D,E
NEW QUESTION 65
To which objects can you assign a user status profile? (Choose three)
- A. A maintenance plan category
- B. An equipment category
- C. An order type
- D. A notification type
- E. A task list type
Answer: B,C,D
NEW QUESTION 66
Factory calendars are assigned to the maintenance plant and work center.
By default, which factory calendar is used for work order scheduling?
- A. Production work center linked to a technical object
- B. Maintenance plant
- C. Planning plant
- D. Main work center
Answer: D
NEW QUESTION 67
Which of the following steps are required to create a measuring point for performance-based preventive maintenance? (Choose two)
- A. Define a valuation code group.
- B. Create the measuring point as a counter.
- C. Activate the Measurement Reading Transfer indicator.
- D. Specify the annual estimated usage for the measuring point.
Answer: B,D
NEW QUESTION 68
You are using a maintenance plan for test equipment calibrations. When is an inspection lot created?
Please choose the correct answer.
Response:
- A. When a follow-up action is triggered from a malfunction report
- B. After entering measuring point data that is out of tolerance
- C. Before the calibration order is created
- D. When the calibration order is created
Answer: D
NEW QUESTION 69
What are the three organizational levels?
There are 3 correct answers to this question.
Response:
- A. Assign
- B. Define
- C. Damage
- D. Collect
- E. Analyze
Answer: A,B,E
NEW QUESTION 70
A customer is using an SC8000 array with three chained SC220 expansion enclosures on a single card. They need to expand its capacity by adding an SC280 enclosure. How should the new expansion enclosure be connected using a minimum number of chains?
- A. Install a new SAS I/O card to connect the SC280 enclosure
- B. Add the SC280 to a new chain on the same SAS I/O card
- C. SC280 enclosures cannot be mixed with other enclosures
- D. Add the SC280 to the same chain as the existing SC220 enclosures
Answer: B
NEW QUESTION 71
What does the maintenance plan category determine?
- A. The type of technical object for the maintenance plan
- B. The grouping of similar maintenance plans together for reporting
- C. How maintenance call objects are generated for a due maintenance call
- D. The type of maintenance call object the system generates for a due maintenance call
Answer: D
NEW QUESTION 72
Which of the following are maintenance work center functions?
There are 3 correct answers to this question.
Response:
- A. Material planning
- B. Capacity planning
- C. Scheduling
- D. Costing
- E. Production resources/tools (PRT) allocation
Answer: B,C,D
NEW QUESTION 73
At runtime communication between the source system and BW is broken down into the following steps:
Identify them .
There are 2 correct answers to this question.
Response:
- A. Loading of data to info provider
- B. Master data
- C. Projection data
- D. Running of analysis.
- E. BW and SAP
Answer: A,D
NEW QUESTION 74
Your customer executes deadline monitoring (transaction IP30).
What happens after you insert additional call dates using the manual call function?
- A. The system restarts the maintenance plan.
- B. The system fixes the next scheduled call date.
- C. The system retains the normal scheduled call dates.
- D. The system reschedules all previous scheduled call dates.
Answer: C
NEW QUESTION 75
What does the structure indicator for a functional location determine? (Choose three.)
- A. The number of hierarchy levels for a particular structure
- B. The number of characters for each hierarchy level
- C. The edit mask
- D. The functional location category
- E. The functional location type
Answer: A,B,C
Explanation:
Explanation
NEW QUESTION 76
......